nav emailalert searchbtn searchbox tablepage yinyongbenwen piczone journalimg journalInfo journalinfonormal searchdiv searchzone qikanlogo popupnotification paper paperNew
2002, 04, 33-36
Reliability evaluation methods of a power distribution metwork
Email:
DOI:
Published:   2002-12-20
Publication Date:   2002-12-20
Mobile reading
Abstract:

Reliability evaluation methods of a power distribution network have been introduced overally including some main popular analytical and simulation methodsTheir advantages,disadvantages and application situation are also comparedThe development trend of reliability evaluation has been predicted

References

[1]别朝红,王锡凡.配电系统的可靠性分析[J].中国电力,1997,30(5):10-13.

[2]BillintonR,WangP.Reliability-network-equivalentapproachtodistributionsystemreliabilityevaluation[J] IEEProceedinggenerationtransmissiondistribution,1998,145(2):149-153

[3]谢开贵,周平,周家启.基于故障扩散的复杂中压配电系统可靠性评估算法[J].电力系统自动化,2001,25(4):45-48.

[4]BillintonR,WangP.Teachingdistributionsystemreliabilityevaluationusingmontecarlosimulation[J] IEEETransonpowersystems,1999,14(2):309-403

[5]Chern LinChen,Jiann LiangChess Aneuralnetworkapproachforevaluationgdistributionsystemreliability[J].Electricpowersystemsresearch,1993,(26):225-229.

[6]MatthenMathereJ.Reliabilityevaluationofdistributionsystemswithnonexponentionaldowntimes[J].IEEETransonpowersystems.1997,12(2):579-584

[7]BrownE,etal.Distributionsystemreliabilityassessmentusinghierarchicalmarkovmodeling[J].IEEETransonpowerdelivery,1996,(4):1929-1934

[8]郭永基,等 考虑容量约束的配电系统可靠性评估[J].电力系统自动化,2000,24(17):48-52

[9]AllanR,etal.Areliabilitytestsystemeducationalpurposes basicdistributionsystemdataandresults[J] IEEETransonpowersystems,1991,6(2):813-820

[10]LiangX,GoelL.DistributionsystemreliabilityevaluationusingtheMonteCarlosimulationmethod[J].Electricpowersystemsresearch,1997,40(2):75-83.

[11]OuY,GoelL.UsingMonteCarlosimulationforoveralldistributionsystemreliabilityworthassessment[J].IEEProceedings:Generation,TransmissonandDistribution,1999,146(5):535-540.

[12]TangY.Powerdistributionsystemplanningwithreliabilitymodelingandoptimization[J].IEEETransonpowersystems,1996,ll(1):181-189.

[13]DoduJ,MrtlinA.Anapplicationoflinearprogrammingtotheplanningoflargescalepowersystems:theMEXICOModel[C].Cambridge,InProc.5th,PSCC,1975.

[14]CunhaS,etal.Compositegenerationandtransmissionreliabilityevaluationlargescalehydroelectricpowersystem[J].IEEETransonPAS,1985,104(10):2657-2663.

[15]PereiraM,etal Anewcomputationaltoolforcompositereliabilityevaluation[J].IEEETransonPWRS,1992,7(1):258-264.

[16]AndersG,etal.Fastmontecarlosimulationtechniquesforpowersystemreliabilitystudies[M].Paris:CIGRESymposium,1990,38-205.

[17]RiigerD,etal.Quantitativereliabilityanalysisofdistributionsystems:repairtimes[J].PowerEngineeringJournal,1997,12(2):704-709.

Basic Information:

China Classification Code:TM711

Citation Information:

[1].Reliability evaluation methods of a power distribution metwork[J].Electric Power Technology and Environmental Protection,2002(04):33-36.

Published:  

2002-12-20

Publication Date:  

2002-12-20

quote

GB/T 7714-2015
MLA
APA
Search Advanced Search