nav emailalert searchbtn searchbox tablepage yinyongbenwen piczone journalimg journalInfo journalinfonormal searchdiv searchzone qikanlogo popupnotification paper paperNew
2020, 05, v.36;No.172 31-36
Analysis and suggestions on development of offshore wind power in China
Email:
DOI:
Received:   2020-05-14
Received Year:   2020
Revised:   2020-06-19
Accepted:   2020-07-06
Accepted Year:   2020
Review Duration(Year):   1
Published:   2020-10-15
Publication Date:   2020-10-15
Mobile reading
Abstract:

Vigorously developing renewable energy is an important means to cope with global climate change, and also an important direction for China's energy structure adjustment and development. Over the past decade, China's onshore wind power and photovoltaic power generation have developed rapidly, and have gradually entered the bidding price/gird parity stage. China's offshore wind power resources are abundant and adjacent to the power load area, which are expected to become the main direction of renewable energy development in the future. However, factors such as high investment, operation and maintenance costs, and immature technology are the main obstacles restricting the offshore wind power development. It is necessary to rationally analyze the current situation and difficulties in China's offshore wind power development, make full use of experiences accumulated in the development of onshore wind power and photovoltaic industry, analyze and consider comprehensively the future development mode of offshore wind power in China.This paper will discuss the necessity of China's offshore wind power development, analyze the current development status and future trends in detail, and finally give some suggestions and opinions on future development.

References

[1]Global wind energy council.Global wind report 2019[EB/OL].https://gwec.net/global-wind-report-2019/.

[2]平安证券研究所.2019年海上风电行业专题研究报告[EB/OL].https://www.docin.com/P.2232258408.html.

[3]Wood Mackenzie.Global wind power market outlook update:Q1 2020[EB/OL].https://www.woodmac.com/reports/power-markets-global-wind-power-market-outlook-update-q1-2020-396404

[4]Shahaboddin Shamshirband,Dalibor Petkovic,Zarko Cojbasic,et al.Adaptive neuro-fuzzy optimization of wind farm project net profit[J].Energy Conversion & Management,2014(80):229-237.

[5]李岩,吴迪,曾冠毓,等.“竞价”背景下福建省海上风电项目经济性分析,能源研究与利用,2019(6):17-19.

[6]施泰.长乐外海风电场集电线路电压选择探讨[J].能源与环境,2019(1):61-62.

[7]中国核电信息网.阳江核电站[EB/OL].http://www.heneng.net.cn/index.php mod=npp&item=nps_show&nps_id=9.

[8]北极星电力网新闻中心.中国超级工程:溪洛渡水电站建设进度一览[EB/OL].http://news.bjx.com.cn/html/20140127/489214.shtml.

[9]胡学萃.“西电东送”南部通道主要输电线路介绍,中国能源报.http://paper.people.com.cn/zgnyb/html/2012-02/27/content_1013622.htm.

[10]叶军,仲雅娟.海上风能利用及其成本分析综述[J].太阳能,2018(6):19-25.

[11]刘子涵.海上风力发电场投资成本分析[J].军民两用技术与产品,2018(16):205-205.

[12]北极星风力发电网.风电光伏补贴缺口超3000亿元[EB/OL].http://news.bjx.com.cn/html/20200102/1033233.shtml.

Basic Information:

China Classification Code:TM614

Citation Information:

[1]HU Wensen,YANG Xigang,LI Gengda.Analysis and suggestions on development of offshore wind power in China[J].Electric Power Technology and Environmental Protection,2020,36(05):31-36.

Fund Information:

国家能源集团2020年科技创新项目“无人值守风电场关键技术研究及工程应用”(GJNY-20-125)

Received:  

2020-05-14

Received Year:  

2020

Revised:  

2020-06-19

Accepted:  

2020-07-06

Accepted Year:  

2020

Review Duration(Year):  

1

Published:  

2020-10-15

Publication Date:  

2020-10-15

quote

GB/T 7714-2015
MLA
APA
Search Advanced Search