The major environmental problems of refuse incinerating power generation project are studied from these aspects which include location selection of project,refuse storage,refuse incinerating and disposal of ash and slag,etc.Then the relevant control measures and suggestions are put forward.
[1]张宝峰.垃圾发电的优势及存在问题[J].西北电力技术,2005(3):42-43.
[2]汪玉林.垃圾发电技术及工程实例[M].北京:化学工业出版社,2003.
[3]高宁博,李爱民,陈茗.城市垃圾焚烧过程中主要污染物的生成和控制[J].电站系统工程,2006,22(1):38-40.
[4]曾慕成,张雄文.国外二噁英污染及其控制[J].工业安全与环保,2002,28(9):13-16.
[5]石谊双,李晓东,陆胜勇,等.硫对垃圾焚烧过程中二噁英生成的抑制作用[J].能源与环境,2005,(1):36-41.
[6]葛俊,徐旭,张若冰,等.垃圾焚烧重金属污染物的控制现状[J].环境科学研究,2001,14(3):62-64.
[7]蒋建国,赵振振,王军,等.焚烧飞灰水泥固化技术研究[J].环境科学学报,2006,26(2):230-235.
[8]Mendrela E A,Mendrela E M,钟尘文.日本垃圾焚烧灰处理现状[J].环境科学动态,1995,(1):28-29.
Basic Information:
China Classification Code:TM619
Citation Information:
[1]WEI Yong-jun,ZHU Geng-fu.The major environmental problems and countermeasures of refuse incinerating power generation project[J].Electric Power Technology and Environmental Protection,2008,No.98(03):57-59.
2008-06-15
2008-06-15